Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Apr 03, 2024     Vertical Stab attach - (6 hours)       Category: Fuselage
Vertical stabilizer was attached to the fuselage and to the HS. This whole tail attachment is definitely a sport where a 90 degree drill is required. The VS was aligned per the plans with respect to getting it square and canted a certain amount of degrees for p factor. The book says a 1/4” off centerline.
Once everything was set, I drilled the hole lot of rivet holes and bolt holes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.